Resealing a Dump Scow Barge ASAP
An engineer at Curtin Maritime needed molded rubber seals delivered in 4 weeks or less to meet their vessel's dry dock installation schedule.
An engineer at Curtin Maritime needed molded rubber seals delivered in 4 weeks or less to meet their vessel's dry dock installation schedule.
An engineer at Curtin Maritime needed molded rubber seals delivered in 4 weeks or less to meet their vessel's dry dock installation schedule.
Catastrophic bearing failures at two Great Lakes shipping companies prompted the marine engineers to re-evaluate the water-lubricated composite bearings installed on their ships.
Expensive parts and long lead times for simple replacement items were causing headaches for the maintenance department at an aluminum plant in the Midwest.